§ 01First, the short version

What is a reserve study?

A reserve study is a long-term plan for your community’s big-ticket repairs. We inspect your shared assets — roofs, paving, elevators, siding and the like — estimate when each will need repair or replacement, and forecast the cost over 30 years. Then we compare that forecast to what you are saving, so your board knows whether today’s dues will cover tomorrow’s projects.

§ 02Know your percent funded

The number boards watch.

Percent funded is your actual reserves divided by what you would ideally have saved. It is a gauge, not a legal standard — and a low number is a starting point for planning, not a verdict on your board.

Poor0–30%Good30–50%Strong50–70%Very strong70–100%
A gauge, not a legal standard. Most associations sit in the middle band, and a number below it is a starting point for planning rather than a verdict on the board.

Do not know yours? That is the usual answer, and working it out is the job a reserve study does. Work it out here if you have both figures, or ask us to calculate it if you do not.

§ 03Where your reserves stand today

Five things to check.

  • We know our current reserve balance
  • We know our percent funded
  • Our most recent reserve study is less than 3 years old
  • We have had a physical site inspection — not just a financial update — within the last 5 years
  • No major component (roof, paving, elevator, siding) is visibly failing ahead of schedule

If you left boxes unchecked, you are not behind — you are exactly who a reserve study is for. Most boards start here.

§ 04What a reserve study maps

What breaks, and when.

Example only — every community's timeline is different. The point is the shape: major components come due at intervals, and the expensive ones cluster.

three majors, three yearsTodayYr 5Yr 10Yr 15Yr 20Yr 25Yr 30Paving sealPool resurfaceExterior paintRoofsPaving overlayElevator modernizationFencingClubhouse HVAC
Bar height is relative replacement cost. The same association could sit at a comfortable percent funded today and still face the window in years 14 to 16 — which is why timing, not a single ratio, decides whether a board is ready. Illustrative, not a real community.
§ 05What triggers a new or updated study

Five common triggers.

  • A state-law deadline or disclosure requirement
  • Your prior study is past its usual cycle (commonly a site inspection every five years)
  • A lender, insurer, or buyer has asked for reserve information
  • A large component is aging faster than expected
  • Board turnover — a new board member wants a clear picture
§ 06What to have ready

Before you begin.

Helpful, not required. If you do not have all of it, we work from what is available and tell you exactly what is missing.

  • Governing documents (CC&Rs, especially maintenance responsibilities)
  • Most recent reserve study, if you have one
  • Current reserve balance and annual contribution
  • Any recent major repair or replacement records
  • Site access for the inspection (gates, roofs, mechanical rooms)
§ 07Questions it will answer

Three answers your board leaves with.

  1. 01

    What will need repair or replacement in the next 5, 10, and 30 years?

  2. 02

    Are we saving enough to pay for it without a special assessment?

  3. 03

    If not, what is our plan to close the gap over time?

A good reserve study answers all three — in plain English your whole board can act on.

§ 08Common questions

§ 09Not sure where to start

That is what we are here for.

North Star Reserves builds reserve studies your board will actually read — clear, visual, and backed by real time spent walking your board through the numbers. 4/10 Guarantee: Your report within 4 weeks of inspection, or 10% off your invoice.

Want the one-page version to forward to your board? Download the PDF.