Skip to content

Built by people who've sat in your seat.

North Star Reserves pairs hands-on HOA and construction experience with funding math a treasurer can defend, and spends real time with the board building a flexible, tailored funding plan.

§ 01Four pillars

01

We have sat in your seat

Board service and construction work change how you read a reserve study. We have been in the meeting where the number lands and someone has to explain it to neighbors. We translate. We do not lecture. That is why the report is written for the people who have to vote on it.

02

Funding math a treasurer can defend

A static table is a snapshot. A model is a set of scenarios: raise contributions slowly, pull a project forward, or hold a line and see the gap. We build the second kind — flexible funding your board can actually choose from, not a single column presented as the only answer.

03

A study you will actually read

The reserve study you'll actually read. Clear, visual, and built for a board meeting — not a binder that never opens. The sample page shows four annotated pages from a real study, with commentary beside each one.

See a sample report

04

Walked with you through a 30-year plan

The industry problem is studies that collect dust. The promise is the opposite: we stay through the funding decisions and the board meeting, and the 30-year plan is something we walk with you — not a PDF we drop and leave.

§ 024/10 Guarantee

The 4/10 Guarantee, in plain language.

4/10 Guarantee: Your report within 4 weeks of inspection, or 10% off your invoice.

The fine printThe four weeks are 28 calendar days, from the site inspection to delivery of your draft report. The clock pauses while we are waiting on documents or access we have asked the association for. If we miss it, 10% comes off your final invoice. For some large or complex studies the window is longer, and when it is, your contract says so before you sign.

We are currently booking site inspections from November. The 4/10 Guarantee clock starts at the inspection, so the draft report follows within four weeks of that date.